-
- 2026/10/9
- Notice Regarding Reactor Startup and Planned Commencement of Commissioning Operation at Mihama Nuclear Power Station Unit 3 (Water Dripping from around the Air Vent Valve on the Outlet Piping of the Normal Level Control Valve for the No. 6A High-Pressure Feedwater Heat Exchanger)
- 2026/10/5
- Notice Regarding Revisions to Low-Voltage Electricity Rate Plans in the Tokyo Metropolitan Area
- 2026/10/5
- Kanden Investor Day
- 2026/9/29
- Notice Regarding Electricity Rate Revisions Following Changes to the Wheeling Service Terms and Conditions
Corporate Data
Using the expertise and advanced technology nurtured through our experience in the electric power industry, we are focusing our research and development on our top priority of power safety and providing a stable supply of electric power.
